A small group of POTW’s and consultants have been working with the DEEP on the MISC Industrial Waste General Permitting Process. Attached are the draft documents that have been produced to date. This revision process has taken place over the last 15 months. Comments should be sent to Sally Keating of the MDC    skeating@themdc.com

MIU GP Draft 04-30-2020

Attachments

Instructions